Abstract

AbstractDevoll Hydropower is currently implementing a large hydropower project in the southeastern part of Albania. This includes the Moglicë hydropower plant with an installed capacity of 184 MW. A 320 m long, 460 m wide and 168 m high rockfill dam with an asphalt core was built for the associated reservoir. To secure the embankments in the area of the dam, bar anchors from DSI Underground were used, some of which are equipped with Dyna Force sensors (photo: DSI Underground).

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call