Abstract
In network scheduling a set of jobs must be scheduled on unrelated parallel processors or machines which are connected by a network. Initially, each job is located on some machine in the network and cannot be started on another machine until sufficient time elapses to allow the job to be transmitted there. This setting has applications, e. g., in distributed multi-processor computing environments and also in operations research; it can be modeled by a standard parallel machine environment with machine-dependent release dates.We consider the objective of minimizing the total weighted completion time.The main contribution of this paper is a provably good convex quadratic programming relaxation of strongly polynomial size for this problem. Until now, only linear programming relaxations in time- or interval-indexed variables have been studied. Those LP relaxations, however, suffer from a huge number of variables. In particular, the best previously known relaxation is of exponential size and can therefore not be solved exactly in polynomial time. As a result of the convex quadratic programming approach we can give a very simple and easy to analyze randomized 2-approximation algorithm which slightly improves upon the best previously known approximation result. Furthermore, we consider preemptive variants of network scheduling and derive approximation results and results on the power of preemption which improve upon the best previously known results for these settings.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.