Abstract

Referring to the lecture held on 16th Mini-Conference on Vehicle System Dynamics, Identification and Anomalies, Budapest, 5-7 November 2018, the accredited Notified Body started the conformity assessment process of the modernized bogie-locomotive body connection of MÁV-START Class V63 electric locomotives running with Ganz-MÁVAG UFC-type bogies, in 2017. Since the planned modification of the locomotives was delayed, the Conformity Assessment Body could perform the necessary riding quality and noise test in the summer of 2020 instead of September 2018. The study presents the modification carried out on the locomotives, the test procedures, and the test results. The aim and the novelty of the research was to apply the latest developments of the test procedures on a modified, existing rolling stock. The conformity for the new requirement makes challenges for the development of testing even if theoretically a well-known test method is applied. The article gives an example for the application of a classic test method combined with of the new possibilities, that makes unnecessary the use of additional railway test cars.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.