Abstract

This paper considers the two-stage flexible flowshop scheduling problem with availability constraints. We discuss the complexity and the approximability of the problem, and provide some approximation algorithms with finite and tight worst case performance bounds for some special cases of the problem.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.