Abstract

This paper considers a two-stage flexible flow shop scheduling problem, where there are a single machine at the first stage and m parallel machines at the second stage. Each task can be processed by multiple parallel machines at the second stage. The objective is to minimize the makespan. Under some special conditions there is a 3-approximation algorithm for this problem. We propose a new ($$2+\epsilon $$)-approximation algorithm without any condition. For the case where all parallel machines assigned to a task at the second stage must have contiguous addresses, we propose two polynomial time approximation algorithms with approximate ratio less than or equal to 3 by using the existing parallel machine scheduling and strip packing results. Meanwhile two special cases are discussed when the machines number of the second stage is 2 and 3 respectively. Two approximation algorithms with approximation ratios of 2.5 and 2.67 under linear time complexity are proposed. Finally a new lower bound of the model is provided according to the classical Johnson algorithm which improves the previous result.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.