Abstract

Meikarta Apartment Project at the beginning of the implementation of the method that is used is a formwork system so that the spring mounting groove formwork and casting becomes inhibited. With some consideration, the formwork method was changed from the Semi si stem method to the System (Table Form). Therefore an analysis of costs and time in formwork planning is carried out in order to obtain effective and efficient planning results. At this stage begins with field observations, literature studies include information gathering, problem formulation activities, primary and secondary data and data analysis processing with the Analysis of SNI Work Unit Price (AHS-SNI) 2018 To produce the price of formwork work which includes wages, materials and tool. Based on the results of the analysis carried out on each formwork method, it was concluded that the Cost of Formwork System Work (Table Form) is cheaper compared to Semi system. The total cost of work using the Semi system as much as Rp. 4,837,286,252.27 While using formwork System (Table Form) as much as Rp. 3,724,594,795.77. This shows that work using the System (Table Form) is cheaper by Rp. 1,112,691,456.50 or around 23%.

Highlights

  • The development of technology in the world of construction in Indonesia was marked by the growing number of innovations that are used in the process of construction

  • For wages the coefficient is 1 but the price of wages is made into 1 m2 unit price as well

  • The results are already summed multiplied by the volume of work, we could see the price of a unit of work in total in the rupiah

Read more

Summary

Introduction

The development of technology in the world of construction in Indonesia was marked by the growing number of innovations that are used in the process of construction. The role of technology grows even greater, especially to simplify the process that occurs in a construction project. One of the examples of the application of technology in the process of construction is the technology of mold concrete or formwork. Formwork is a temporary structure because up to a certain time limit will be demolished , while the concrete structure is a permanent structure. M de- scribes that the structures while is a means of liaison between the design and execution of construction. The structure of the structure permanently not be built without the structures while the

Methods
Results
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.