Abstract

The floor plate (slab) is one of the moving formwork methods by a traveler or formwork system, where in the process of moving formwork components using a driving motor to get more effective and efficient results, cost price analysis of the implementation of the moving formwork method by a traveler is obtained from unit price analysis multiplied by the volume of work for the slab, the time duration and work productivity are obtained from the calculation of the cycle time execution time. The cost analysis of the slab on the Jakarta-Cikampek II Elevated toll road project using the moving formwork method by a traveler gets a cost-effectiveness value of 5.54% more efficient than using the usual formwork method, the total cost of slab work with the use of a moving form traveler is Rp. 2,764,000,000.00, From the duration of the implementation of the use of the moving formwork method by the traveler, it was found that the effectiveness of the time was 9 days faster than the usual formwork method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.