Abstract

In this Letter, it is shown that the schedulability test method for task sets with the maximum period ratio larger than or equal to 2 presented in the paper [Wei et al., Generalized rate monotonic schedulability bounds using relative period ratios, Information Processing Letters 107 (5) (2008) 142–148] is not exactly correct by presenting a counter-example. Correct sufficient conditions for using period ratios in RM schedulability test when the maximum period ratio is not less than 2 are also presented.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call