Abstract

The CMD-2 detector [1] is taking data at the VEPP-2M collider with a peak luminosity of 5 × 10 30 cm −2s −1. The expected increase in the luminosity of the machine from 5 × 10 30 cm −2s −1 up to 2 × 10 31−10 32 associated with an upgrade [2] of the VEPP-2M collider facility puts new requirements on the trigger and DAQ systems. The new DAQ and trigger systems will meet the challenge of the increased data flow at the upgraded VEPP-2M collider.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.