Abstract
The CMD-2 detector [1] is taking data at the VEPP-2M collider with a peak luminosity of 5 × 10 30 cm −2s −1. The expected increase in the luminosity of the machine from 5 × 10 30 cm −2s −1 up to 2 × 10 31−10 32 associated with an upgrade [2] of the VEPP-2M collider facility puts new requirements on the trigger and DAQ systems. The new DAQ and trigger systems will meet the challenge of the increased data flow at the upgraded VEPP-2M collider.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have