Abstract
Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to 'owner - contractor' pair with 77.1% importance indices; whereas the lowest belongs to 'consultants - contractors' pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Construction Engineering and Project Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.