Abstract

This paper is used by the combined test technology of resistivity composite profile and high-density resistivity method. Regard Daiyuling the first tunnel engineering geology survey work area as a test site. Different physical parameters such as resistivity composite profile curve of transverse sectionⅠ~Ⅳ line and vertical profile and measured, fitting apparent resistivity quasi section measured by high-density resistivity method reflect geological phenomenon. Through mutual contrast verification, improve the accuracy and reliability of survey results. Provide necessary geophysical basis for engineering geological exploration.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call