Abstract

PT. Bogatama Marinusa is one of the fishery industry sectors located in South Sulawesi that moves in shrimp processing and frosting as pioneer of fishery industry in southern Sulawesi. PT. Bogatama Marinusa certainly wants the planned production target to be achieved as expected, where every day the company processes raw materials with the capacity of approximately 575 kg for vannamei shrimp and 425 kg for black tiger shrimp. At deheading work station (shrimp head separation) and sortation area (sorting) materials buildup occurs in the production flow (bottle neck) which results an idle time to other work stations. With the existence of these problems, it is necessary to do production line balancing in order to minimize idle time and be able to balance the production lines so that the works carried out effectively and efficiently. The method used for overcoming the production line imbalance is by applying line balancing, namely the heuristic method, which is calculation using Regional Approach (RA) and Ranked Positional Weight (RPW) methods. Line efficiency (LE) increased by 83.33%, smoothing index (SI) decreased by 160.90, balance delay (BD) decreased by 16.66%, and idle time (IT) decreased by 264 minutes, and production capacity could be increase to 1,022 kg means that the results are far better than the current conditions.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call