Abstract

<p><em>Line balancing is a jobs assignment into a number of work stations that are interrelated in a track or a production line with an objective to minimizing the idle time on the line that is determined by the slowest operation. In line welding 1DY models includes eight work stations where one work station is done by one operator. Problems have been found that these operators have very long idle time and also there is too much wip that creates bottleneck in the production line so these leads to a waste of manpower and time. This waste of manpower and time need to be reduced by determining the optimal amount of labor in order to avoid excessive idle time but work can be done effectively and efficiently. One way to adress imbalance line is to apply line balancing methods.The results of this research shows that the line balancing methods can reduced the waste of time and give solutions for the optimal amount of labor requirements for line welding 1DY models.</em></p><p>Keywords: Line Balancing, Workstation, Production Line, Idle Time, Bottleneck.</p><p><em><br /></em></p>

Highlights

  • Keseimbangan lini adalah suatu penugasan sejumlah pekerjaan kedalam stasiun-stasiun kerja yang saling berkaitan dalam suatu lintasan atau lini produksi dengan tujuan meminimumkan waktu menganggur pada lintasan yang telah ditentukan oleh operasi yang paling lambat.Pada line welding model 1DY terdapat 8 stasiun kerja dimana 1 stasiun kerja dikerjakan oleh 1 operator

  • a jobs assignment into a number of work stations that are interrelated in a track

  • a production line with an objective to minimizing the idle time on the line that is determined by the slowest operation

Read more

Summary

Rumusan Masalah

Data serta pengolahan data yang didapatkan dari line welding 1DY, dapat diuraikan rumusan masalah penelitian sebagai berikut: a. Bagaimana meningkatkan performansi line welding 1DY yang ada saat ini?. B. Bagaimana mendapatkan model keseimbangan lintasan yang lebih efisien untuk line welding 1DY?. C. Berapakah jumlah kebutuhan operator/tenaga kerja (manpower) yang ideal untuk line welding 1DY?

Tujuan dan Manfaat Penelitian
Metode Penelitian
Parameter Performansi Line
Hasil Pembahasan
Hari kerja
Smoothness Index
Perhitungan Jumlah Stasiun Kerja
Takt Time
Moodie y
Daftar pustaka