Abstract

Production line is a set of sequential operation that support refinery process product from raw material to end process into finish product. However, due to the operations have different time process to finish an item/part, it caused unbalance processing time in certain work station in a production line. This problem increases overtime to work station with heavy load tasks, in the contrary to work station with low load tasks results idle workers. Overtime is definitely cost to organization. PT. Metindo Era Sakti has overtime as their issue. To balance the process time in work stations, line balancing method is one of option to the problem. Line Balancing uses to reduce overtime by increasing production line efficiency, reducing delay time, and decreasing worker idle time [8]. By using Rank Positioned Weight (RPW) and Largest Candidate Rules (LCR) and comparing those methods was proven that production line efficiency increased by 85,63%, delay time decreased by 14,37%, and reduced idle time by 3,77 minutes. Therefore, while reducing overtime, PT. Metindo Era Sakti enable to minimize overtime cost by Rp. 4.092.000 each year.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.