Abstract

Abstract This paper focuses on solving Security Constrained Unit Commitment (SCUC) problem using ABC algorithm incorporating FACTS devices. The objective of the SCUC problem is to obtain the minimum operating cost simultaneously maintaining the security of the system. The SCUC problem is decomposed into Unit Commitment (UC), the master problem and Security-Constrained Economic Dispatch (SCED) as the sub-problem. The existing generation constraints, such as hourly power demand, system reserves, and minimum up/down time limits, ramp up/down limits are included in the SCUC problem formulation. The ability of FACTS devices to control the power flow through designated routes in transmission lines and thereby reducing the overloading of lines are studied. The solution of SCUC problem is also analyzed during a single line outage contingency. The SCUC is carried out incorporating FACTS devices such as SVC, TCSC, STATCOM, SSSC, UPFC and IPFC. The modeling of the FACTS devices within the power system network and finding a suitable location are discussed. The SCUC has been solved and validated on an IEEE 118-bus test system and a practical South Indian 86 bus utility.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call