Abstract
The implementation of construction projects in Indonesia in general the number of work accidents also increased. Referring from BPJS, nationally the number of work accident accidents in the construction sector was recorded as the national sector with the highest number of occupational accidents. The regulations regarding OHS financing in Indonesia have not been clearly and measurably regulated. Existing regulations regarding HSE financing are regulated in three regulations, namely, Permen PUPR No. 31/2015, SE Menteri PUPR No. 66/2015, Permen PUPR No. 28/2016, and the last in SE Menteri PUPR No. 11/2019. Activity-Based Costing (ABC) has emerged as a new approach that connects costs directly related to business activities with manufactured products. This study aims to identify any risks that are potentially hazardous in irrigation work, making a safety plan using risk-based WBS standards, and the results of this research can make Analysis cost of safety for irrigation works.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.