Abstract
The government of Indonesia is targeting a supply shortage or housing backlog in 2019 to be 5.4 million. With the shortage of rental housing needs that are still very large, the development needs of rental flats in the future are still very high. But on the other hand, the implementation of construction projects in Indonesia, in general, the number of work accidents also increased. Referring to Labor Social Service Agency (BPJS) data, nationally the number of occupational accidents in the construction sector is recorded as the most national sector of the number of occupational accidents. Managerial finance is important to assist the process of making decisions related to work safety. While the regulations and provisions concerning occupational, health, and safety (OHS) financing in Indonesia in the construction sector, especially in buildings, have not been clearly and measurably regulated. In its implementation, the existing regulations have not been fully followed by construction actors even within the Ministry of Public Works and Public Housing itself. Architectural works on building construction, in this case, the construction of rental apartments is a job that has the highest number of work items compared to other types of work items. This study resulted in standardized Work Breakdown Structure, safety risks identification, mitigation risks and the component of safety cost for Architectural Works in Rental Apartments Building Construction Project.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have