Abstract

Budong-Budong Dam is located on Salulebo River, West Sulawesi Province, and has a diversion tunnel to divert river flow so as not to interfere with construction at the main dam. This diversion tunnel has a D shape which is dimensions 5 m. The Method used in empirically assessing rock mass quality is Rock Mass Rating (RMR) and Japan Society of Civil Engineers (JSCE). The data used are RMR values and rock-type categories. The results show that the diversion tunnel is in lithology tuffaceous sandstone intercalation tuffaceous siltstone and tuffaceous breccias. Weathering degree from slightly-weathered to highly-weathered. The dominance RMR value is 27-53 and rock-category is CII with L massif rock type. The excavation method based on RMR is top-heading and bench and the excavation method based on JSCE is a full-face method with an auxiliary bench cut. Support systems proposed by RMR and JSCE are rock-bolts, shotcrete, and steel sets (steel support). Even though it has been done empirically, it needs to be considered for modeling to be effective and efficient.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call