Abstract
Ferrous ion can be used as electron donor for denitrification in the ferrous ion-dependent nitrate removal (FeNiR). To prevent the FeNiR performance decrease caused by iron encrustation, a modified FeNiR process with batch sludge replacement was developed. Based on the decay kinetics of sludge mass and sludge activity, the sludge retention time (SRT) was determined as 40 days in the modified FeNiR process. To keep the FeNiR rate at 0.70 kg-N/(m3·d), the sludge replacement amount was 25% of total sludge every 10 days. The FeNiR efficiency stabilized around 70%. The batch sludge replacement could be an effective method to offset the active sludge decay caused by iron encrustation, and therefore led to the good FeNiR performance. The wasted FeNiR sludge was found to adsorb phosphate at a rate of 0.9 mg-P/(g VS min). The modified FeNiR process was proposed to be coupled with phosphate removal, achieving the co-removal of nitrate and phosphate. The coupled technology is promising due to the less consumption of resources and energy, as well as the less production of excessive sludge.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have