Abstract

Using polygeneration systems is one of the most cost-effective ways for energy efficiency improvement, which secures sustainable energy development and reduces environmental impacts. This paper investigates a polygeneration system powered by low- to medium-grade waste heat and using CO2 as a working fluid to simultaneously produce electric power, refrigeration, and heating capacities. The system is simulated in Aspen HYSYS® and evaluated by applying advanced exergy-based methods. With the split of exergy destruction and investment cost into avoidable and unavoidable parts, the avoidable part reveals the real improvement potential and priority of each component. Subsequently, an exergoeconomic graphical optimization is implemented at the component level to improve the system performance further. Optimization results and an engineering solution considering technical limitations are proposed. Compared to the base case, the system exergetic efficiency was improved by 15.4% and the average product cost was reduced by 7.1%; while the engineering solution shows an increase of 11.3% in system exergetic efficiency and a decrease of 8.5% in the average product cost.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.