Abstract
Enhancing oil recovery in reservoirs with light oil and high gas content relies on optimizing the miscible water alternating gas (WAG) injection profile. However, this can be costly and time-consuming due to computationally demanding compositional simulation models and numerous other well control variables. This study introduces WAGeq, a novel approach that expedites the convergence of the optimization algorithm for miscible water alternating gas (WAG) injection in carbonate reservoirs. The WAGeq leverages production data to create flexible solutions that maximize the net present value (NPV) of the field, while providing practical implementation of individual WAG profiles for each injector. The WAGeq utilizes an injection priority index to rank the wells and determine which should inject water or gas at each time interval. The index is built using a parametric equation that considers factors such as producer and injector relationship, water cut (WCUT), gas–oil ratio (GOR), and wells cumulative gas production, to induce desirable effects on production and WAG profile. To evaluate WAGeq’s effectiveness, two other approaches were compared: a benchmark solution named WAGbm, in which the injected fluid is optimized for each well over time, and a traditional baseline strategy with fixed 6-month WAG cycles. The procedures were applied to a synthetic simulation case (SEC1_2022) with characteristics of a Brazilian pre-salt carbonate field with karstic formations and high CO2 content. The WAGeq outperformed the baseline procedure, improving the NPV by 6.7% or 511 USD million. Moreover, WAGeq required fewer simulations (less than 350) than WAGbm (up to 2000), while delivering a slightly higher NPV. The terms of the equation were also found to be essential for producing a WAG profile with regular patterns on each injector, resulting in a more practical solution. In conclusion, WAGeq significantly reduces computational requirements while creating consistent patterns across injectors, which are crucial factors to consider when planning a practical WAG strategy.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of Petroleum Exploration and Production Technology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.