Abstract

With dispersed construction projects, for example, in transport construction, especially in the regions of the North and the Arctic, there are problems with organizing the repair of construction equipment. This is due to the peculiarities of the transport and technological machines used, the natural and climatic conditions of the region, problems with attracting local labor resources, an underdeveloped transport network and limited opportunities for using the local industrial base. The operation of equipment in these conditions is associated with an increase in the number of failures due to the increased harshness of the climate. Solving the problems of organizing repairs requires a correct assessment of the need for repairs, the formation of a repair system, including the creation of a system of workshops and their placement along the route under construction, ensuring the efficient loading of workshops and minimizing the downtime of machines under repair. Keywords: organization of repair, construction equipment, transport construction, northern regions

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call