Abstract

A problem of scheduling the production of pharmaceuticals in a limited number of vessels is presented. It has the characteristics of sequence dependent changeover times, multi-stage production, parallel usage of vessels and flexibility in the choice of vessels. An optimizing procedure is discussed, but dismissed as computationally infeasible. Consequently, a heuristic is developed, and its performance evaluated. Typical results are also reported.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call