Abstract

This paper deals with the concurrent solution of the loading and scheduling problems in a flexible manufacturing system ( FMS) environment. It is assumed that the FMS environment has production planned periodically and each job in the system has a number of operations to be processed on flexible machines. A heuristic approach using a constructive scheduling method is developed to solve the FMS loading and scheduling problems concurrently. The computational results are compared to an existing procedure that considers a hierarchical approach with a similar problem environment. The comparison study shows a significant improvement over the existing hierarchical procedure. This experiment indicates that a concurrent solution approach can solve the FMS loading and scheduling problems very effectively.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.