Abstract

This paper proposes a novel approach for maintenance scheduling of generation units in a competitive environment. In the restructured power systems, the objective function of the generation units is to maximize their benefit. In addition, the aim of the Independent System Operator (ISO) is to maximize the reliability throughout the year as much as possible. The main contribution of this paper is considering the condition of demand side in the Maintenance Scheduling (MS) of generation units and scheduling the outage windows of generation units to attain maximum Annual Social Welfare (ASW). In this scheme, unit maintenance scheduling is considered as a single-stage process instead of a repetitive and multi-stage process and authority of maintenance scheduling has been granted to the ISO. Broadly defined, independent operator system tries to maximize both ASW and units' annual benefit. This method is tested in bilateral energy market and the IEEE-RTS system is used as a system test to demonstrate the efficiency of proposed method. In this paper CLONAL Selection Algorithm is applied for finding the optimum maintenance scheduling of generation units.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.