Abstract
The authors were motivated to overcome some of the limitations and shortcomings of the existing software systems for management of construction projects. The result is a new generation software system for CONstruction Scheduling, Cost Optimization, and Change Order Management, which is called CONSCOM. CONSCOM uses the recently patented Neural Dynamics model of Adeli and Park as its computational engine for construction cost optimization and advanced software engineering and object‐oriented programming techniques such as framework and pattern. This paper presents some of its recent and innovative capabilities and features. CONSCOM includes an Integrated Management Environment (IME) as its user interface for the effective control and management of construction projects. An example of a highway construction project is presented to demonstrate the unique modelling capabilities of CONSCOM that cannot be modelled by Critical Path Method (CPM) or CPM‐like networks.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have