Abstract
AbstractConstruction schedule control is an important task in the actual construction management process of the project, and it plays a key role in the process of controlling the construction quality. As the organizational structure of the entire project, as well as the process of construction and implementation have become more complex, the actual investment amount of the project has also become greater, resulting in a huge waste of investment in the national economy and society. One of the reasons is due to the project. The management efficiency is low, so the progress of the project cannot be well controlled. Therefore, we are required to adopt more efficient technical means to improve the effectiveness of program management. At present, BIM is to achieve the goal of project control and management, and to achieve the most effective project, but it is still rarely used widely in its construction schedule, and it mainly focuses on practical analysis. In fact, BIM is relatively rarely used in engineering. This article explores and studies the practical application of BIM information technology in construction schedule control and management of construction projects, and analyzes and summarizes some of the problems existing in China's traditional construction schedule control and management on the basis of summarizing relevant documents. Then it analyzes some of the advantages and disadvantages introduced by the BIM information technology used in the construction schedule control and management of China's construction projects, and then builds the schedule control platform of China's BIM information technology in the construction of construction projects based on the above foundation. Finally, the number of people on a platform built by the platform was tested. The test results show that although the platform still has shortcomings, overall, the management system accounts for more than 32% of people with good engineering performance evaluation, generally 30% the above.KeywordsBIM technologyEngineering constructionSchedule managementManagement platform
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.