Abstract

Time and space assembly line balancing consid- ers realistic multi-objective versions of the classical assem- bly line balancing industrial problems. It involves the joint optimisation of conflicting criteria such as the cycle time, the number of stations, and/or the area of these stations. The different problems included in this area also inherit the precedence constraints and the cycle time limitations from assembly line balancing problems. The presence of these hard constraints and their multi-criteria nature make these problems very hard to solve. Multi-objective construc- tive metaheuristics (in particular, multi-objective ant colony optimisation) have demonstrated to be suitable approaches to solve time and space assembly line balancing problems. The aim of this contribution is to present a new mechanism to induce diversity in an existing multi-objective ant col- ony optimisation algorithm for the 1/3 variant of the time and space assembly line balancing problem. This variant is quite realistic in the automative industry as it involves the joint minimisation of the number and the area of the stations

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.