Abstract
Time and space assembly line balancing considers realistic multiobjective versions of the classical assembly line balancing industrial problems, involving the joint optimization of conflicting criteria such as the cycle time, the number of stations, and/or the area of these stations. The aim of this contribution is to present a new multiobjective memetic algorithm based on ant colony optimization for the 1/3 variant of this family of industrial problems. This variant involves the joint minimisation of the number and the area of the stations, given a fixed cycle time limit. The good behaviour of the proposal is shown in nine problem instances.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.