Abstract
Prior-art market mechanism designs in the literature do not well distinguish the primary frequency reserve resources with different response rates. This letter proposes a performance ratio that quantifies the relative effectiveness of generators and flexible demand resources in frequency regulation considering their response rates. The performance ratio is incorporated into a real-time market clearing model to optimize both upward and downward primary frequency reserve resources. The proposed method is validated based on the IEEE 118 bus system.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have