Abstract

Monte Carlo Simulation is a mathematical technique that generates random variables for modelling risk. This technique is suitable and benefits to the various client such as public and private sector to evaluate the realistic costing proposed by the Quantity Surveyor. Through this approach, quality of life received by the client in investing budget without waste of propose funding in the construction project. The methodology used is a qualitative approach consist of case study and document analysis. The result shows through Monte Carlo simulation, can predict the worst return from the accuracy of the estimation and given absolute confidence for project development. 
 
 Keywords: Monte Carlo, Risk Analysis, Cost Prediction, Qualitative Approach 
 
 eISSN: 2398-4287 © 2020. The Authors. Published for AMER ABRA cE-Bs by e-International Publishing House, Ltd., UK. This is an open access article under the CC BYNC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). Peer–review under responsibility of AMER (Association of Malaysian Environment-Behaviour Researchers), ABRA (Association of Behavioural Researchers on Asians) and cE-Bs (Centre for Environment-Behaviour Studies), Faculty of Architecture, Planning & Surveying, Universiti Teknologi MARA, Malaysia.
 DOI: https://doi.org/10.21834/e-bpj.v5i13.2101

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.