Abstract

This paper addresses a dynamic Capacitated Production Planning (CPP) problem in steel enterprise employing a closed-loop supply chain strategy, in which a remanufacturing process is adopted. We develop a model in which all demands are met by production or remanufacturing without backlogs, under the context that both the production and remanufacturing setup cost functions are arbitrary and time-varying. We also develop a corresponding genetic algorithm (GA) heuristic approach, and run a numerical simulation to test our algorithm's efficiency by comparing with Branch and Bound method. The simulation results illustrate our algorithm's accuracy and efficiency in large scale problems.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call