Abstract

In the construction process, the concrete dam is divided into many blocks which are further divided into many horizontal layers with thickness 1.5–3.0m. Generally, there are several years from the beginning to the completion of construction of a dam. Due to the variation of air temperature, the hydration heat, and pipe cooling, the variation of temperature field is very complex. It is difficult to compute the thermal stresses in the construction period by the traditional methods of structural mechanics. As the number of the monitoring instruments is small, it is also difficult to give the actual stress field of a concrete dam in the construction process by the instrumental monitoring. Only the finite element method can be used to give the simulation computation of concrete dams considering the process of construction and all the factors which influence the temperature and stress fields of the dam. If necessary, it can give the factor of safety by overload computation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.