Abstract

The issues of forecasting the resource of the suspension from the leaf spring of the vehicle using energy consumption during cyclic loading are presented. A refined formula for calculating energy consumption is given, which has a closer connection with failures of parts in operating conditions than kilometers of mileage. It is shown that when the vehicle is moving, the suspension is loaded and unloaded, described by the «hysteresis loop» calculation method. The area of the hysteresis loop is used in predicting the suspension resource using a neural network. This makes it possible to increase the utilization rate of the vehicle by reducing costs and downtime during current repairs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.