Abstract

The article presents the planned indicators of road freight transportation in the conditions of the Far North, which are determined as a result of the experiment for real operating conditions. The research used modern mathematical methods. The probabilistic values of indicators are established - time for loading, time for unloading, distance, speed, time for movement using special equipment. The equations of regression dependences of production and mileage on probabilistic indicators are obtained, which made it possible to determine the plan for road freight transportation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.