The article discusses the schedule for the production of dismantling works in normal and cramped conditions. The analysis of resources to reduce the production of work and ways to improve the manufacturability of the production of dismantling works. A combined method of work performance with the use of modernized construction equipment and an increase in output per unit of structure is considered.