Abstract

Today, we often have to deal with the implementation of works on the construction of buildings and structures in the central regions of large cities with already established buildings. This is especially true when implementing projects for renovation or reconstruction of historical objects. The article analyzes the main types of restrictions for construction in cramped conditions. For example, heavy traffic and pedestrians, the presence of underground utilities, the lack of sites for storing materials, difficult access to structures for their survey, the inability to use large construction equipment, etc. Cramped conditions create a whole range of restrictions for the construction works, which can lead to the emergence of a certain group of risks. The article discusses the main risk groups in construction (financial, temporary, project, quality) and their causes. In the article each of the restriction in the construction in cramped conditions and the risks that they can cause are analyzed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.