Abstract

The article discusses the issues of connecting microgeneration facilities based on renewable energy sources (RES) to electric networks of low voltage (LV) 0,4 kV. This method of connection will allow the use of microgeneration facilities as network sources of energy, and at the same time unused electrical energy generated by micro-generation facilities can be supplied to a low-voltage network of 0,4 kV. Methods of simulation modeling of the processes of electrical energy distribution in the power supply system with microgeneration objects are proposed; the requirements for the power grid controller used to ensure the connection of micro-generation facilities to the low voltage network are formulated. The problems arising in connection with this are analyzed and the ways of their solution are offered. The proposed methods for the development of software and hardware solutions using modern methods of simulation of electrical energy generation and distribution based on rapid prototyping in the Matlab Simulink environment make it possible to carry out field experiments in order to simulate the processes occurring in 0,4 kV low voltage electrical networks using microgeneration objects prosumers.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.