Abstract An absorption and desorption rig has been in operation at Telemark University College since 2010. The purpose of the rig is to perform measurements of CO2 removal efficiency and heat consumption at different process conditions like temperatures, flows and CO2 concentrations in the gas and the liquid. 30 wt-% monoethanolamine (MEA) in water has been the most used solvent. In earlier work, the heat consumption has been indirectly measured by the electricity consumption for steam production. In this work new results from 2012 and 2013 are presented where the steam consumption has been measured directly by a vortex flow meter.