The renovation of the St. Yohanes Evangelist Church project located on 197, Melawai Street Kebayoran Baru, Jakarta with a building area about 1480.9 m2 was chosen as a research object because the Church Construction Committee wanted to accelerate the renovation project from 2 years 5 months targeted to 1 year 5 months. This is because the Church of St. John the Evangelist as a place of worship can be immediately used again. The PERT method can be used to manage projects more efficiently and effectively; to be able to know the possibility of accelerating the duration of the project carried out on activities in the critical path and the shortening of the duration of each work on each alternative is equalized. In this study, the critical path compression step of the network using Microsoft Project and the results of the Project Evaluation and Review Technique (PERT) method, obtained a probability of 99.88%, so the renovation project of Saint John Evangelist Church can be an accelerated project to 1 year 5 months.
Read full abstract