Dagang oilfield belongs to typical multi-layer system, heterogeneity of complex fault block reservoir, reservoir and the large difference of physical property of crude oil, water, etc, the longitudinal permeability difference is obvious, separate injection interval is not detailed, The existing bridge eccentric note, bridge concentric injection technology can’t meet the needs of the fine water injection, real-time measurement and control because of drift, well depth, pressure and other factors, and there is poor adaptability, measuring problem of long time and low efficiency. Cable type fine intelligent water injection technology in underground intelligent water distributor, the ground controller as the core tools, cable as transmission medium, the computer network communication technology, intelligent control technology combined with oil field water injection demand, developed a new and reliable water injection system, realized the layered injection allocation under different deviation, full automatic control and monitoring data, and direct reading test. The technology in the implementation of 5 Wells in dagang oilfield, the implementation of maximum deviation 80 °, the maximum depth of 3661.52 m, the highest water flooding pressure 25 mpa, construction success rate reaches 100%, downhole test times 5 Wells, inspection accuracy of 100%. The results show that the cable type intelligent water flooding technology can not only realize downhole data real-time monitoring, real-time traffic regulation, and can complete the packer direct reading test, and the measurement process is reliable and efficient, at the same time solve the high Angle well, horizontal well can’t test the technical problem, provides the high Angle well, horizontal well fine water injection technology support.
Read full abstract