The construction of the ATLAS strip tracker barrel will require the assembly of 12,000 barrel detector modules over the course of 3.5 years. In 2022, during the module pre-production phase, modules were found to display clusters of noisy channels outside required specifications when tested at operating temperatures (-35°C), called “Cold Noise”. Extensive investigations into the cause and mechanism of Cold Noise interrupted pre-production and occupied most barrel module assembly sites. This contribution presents an overview of the year-long investigations into Cold Noise, the final identification of the underlying mechanism and necessary changes for the transition to production.
Read full abstract