Abstract

The construction of the ATLAS strip tracker barrel will require the assembly of 12,000 barrel detector modules over the course of 3.5 years. In 2022, during the module pre-production phase, modules were found to display clusters of noisy channels outside required specifications when tested at operating temperatures (-35°C), called “Cold Noise”. Extensive investigations into the cause and mechanism of Cold Noise interrupted pre-production and occupied most barrel module assembly sites. This contribution presents an overview of the year-long investigations into Cold Noise, the final identification of the underlying mechanism and necessary changes for the transition to production.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call