Proper planning, scheduling, tracking and application administration are the major parameter in construction industry. The systematic flow of work is adopted by using techniques called Critical Path Method (CPM) and Programme Evaluation and Review technique (PERT). The state for management of the project .and the goal intended to attain project planning is to bring forth a time table of work with each activities. The main goal intended from the project is to complete with proper plan and schedule within the gross budget allotted for actual project. The complete process of using resources and to achieve quality in construction can be done by proper project management. The Oracle primavera p6 software includes all possible details to scale with multi-project planning control even for a wide range of projects, thus proper resource allocation and project portfolio management can be achieved by sitting on single system. Planning, scheduling, tracking and administration application in primavera is an advance technology in construction industry which requires the study of material, manpower, improved design and hence improves the construction management technique.
Read full abstract