Currently, Korea Domestic Agency (KODA) for the International Thermonuclear Experimental Reactor (ITER) project or the ITER Korea has been conducting follow-up surveys and development researches for the core technologies of its non-procurement items. This eventually aims to secure implicit as well as explicit knowledge and expand domestic specialists for future fusion facilities including K-DEMO. As a part of the project, the comparative analysis and gap study of technical standards and Quality Assurance (QA) system between ITER and Korean nuclear facilities are being performed. The goal of this study is to present a roadmap re-systematizing current safety-related standards for the fission-based facilities into fusion-based facilities in Republic of Korea.The research is considering two different tracks. First one is to secure the state-of-the-art of the fusion technical standards continually updated. For its investigation, we organized the Korean fusion safety advisory group that consists of experts from institutes, industries, and universities. The latest information of technical standards have been gathered and updated from each area of expert in periodic manner. The information is classified into Product Breakdown Structure (PBS) including safety classification, major safety issues, analysis computer codes, etc. This task will be re-organized this year such that the technical standards for procurement as well as non-procurement items can be accumulated in systematic and sustainable manner. Second one, called “Gap Study,” is to compare the requirements for domestic nuclear facilities and the results from the first track on the basis of experts’ opinion from the national and private sectors and to recommend the approaches to overcome technical and administrative barriers. The result is, therefore, expected to contribute to K-DEMO project from the licensing and regulatory aspect.