The shallowly buried covered excavation PBA method is one of the new construction methods that has attracted widespread attention in the past 20 years. Understanding the deformation of strata and supporting structures is key to ensuring the safe construction of PBA stations at present. Relying on the Beijing Line 12 Beitaipingzhuang PBA subway station and based on the 1:40 model test, the production of similar materials for the model and the station excavation construction plan are introduced. According to the actual construction process of the station, the construction process of the two stations of the pile foundation and strip foundation stations are more realistic. The variations in the strata around the station and the station structure during the whole construction process are obtained. The test results show that the ground displacement of the station is most affected by the excavation of the pilot tunnel, accounting for more than two-thirds of the total displacement, and the ground within the range of 0–12 m around the station is greatly affected by the excavation disturbance during the actual construction process. By analyzing and comparing the ground displacements and the internal forces of the vertical bearing structure of the two types of stations, it is concluded that the pile foundation method is more advantageous for controlling ground displacement and the internal force of the structure. These test results improve design theory of the PBA method and are conducive to further promotion.
Read full abstract