Existing deep foundation pit support structures are commonly composed of external earth-retaining structures, internal horizontal bracings, and vertical columns. A closed bracing system, often formed by a horizontal support through a bracket board, frequently impedes vertical excavation and soil removal operations in the foundation pit, and the processes of assembly and dismantling are complex and time-consuming. This study presents a combined support system and construction method consisting of cast-in-place piles and diagonal steel lattice braces. For sloped excavation, diagonal braces were constructed by slotting through the reserved soil, allowing the use of a single layer of support within the excavation depth. This approach significantly optimizes the construction process, reducing both project duration and overall cost. The field monitoring results indicated that the support method effectively controlled the lateral displacement of the pile bodies. Field monitoring results demonstrated that the proposed support system effectively controlled the lateral displacement of the pile bodies. The adoption of a support-first, excavation-second approach significantly controlled the settlement of the ground surface around the foundation pit, thereby preventing excessive increments in the axial force of the supports due to the large longitudinal depth excavation. The calculation results of the three-dimensional finite element model for foundation pit excavation and support indicate that the proposed support method results in a decreasing ratio of the maximum lateral deformation depth of the pile body, denoted as δh-m, to the excavation depth He as the excavation depth increases. This implied that the displacement of the pile body was strictly controlled. When the depth of the foundation pit excavation exceeded 10 m, the maximum lateral deformation occurred below 10 m along the pile shaft. The diagonal steel lattice braces transferred the load to the top of the cast-in-place piles at the bottom of the pit, where the stress concentration occurred. During construction, special attention must be paid to the strength of the connection between the pile top and the connecting beams.