Supplying power for large pulsed power load with shipboard medium voltage direct current integrated power system has continued to be a challenge. The energy storage device configured in the system can effectively mitigate the power impact on grid and gas turbine gensets, but it also complicates the system operation, requiring advanced power sharing and control strategies for support. In this paper, the control framework of system configured with hybrid energy storage is presented, the objective function to quantify transient power disturbance on gas turbine genset is established, and the segmented variable step dynamic programming method for system transient power sharing is innovatively proposed and employed to derive the optimal transient power-sharing scheme for the rectangular and triangular large pulsed power load conditions. Compared with the conventional approach through MATLAB/Simulink simulation, the scheme derived from segmented variable step dynamic programming demonstrates enhanced utilization of the transient power compensation capability of hybrid energy storage, and leads to a reduction in the power regulation pressure on gas turbine gensets. In the assumption of two typical operating processes, as the results of the power impacts,the transient regulation rate of the genset rotor is reduced from 10.4 % to 9.9 % and from 13.7 % to 8.6 %, respectively, the fatigue damage of shaft system is decreased by 53 % and 94.4 %, respectively, and the maximum inlet relative temperature of gas generator turbine is reduced by 0.015 and 0.139, respectively.
Read full abstract