JAWRA Journal of the American Water Resources AssociationVolume 22, Issue 1 p. 139-139 “Probable Maximum Flood Estimation — Eastern United States”2 Paul B. Ely, Paul B. Ely Respectively, Hydraulic Engineer and Software Consultant, Arcata, California; and Hydraulic Engineer, The Hydrologic Engineering Center, 609 Second St., Davis, California 95616.Search for more papers by this authorJohn C. Peters, John C. Peters Respectively, Hydraulic Engineer and Software Consultant, Arcata, California; and Hydraulic Engineer, The Hydrologic Engineering Center, 609 Second St., Davis, California 95616.Search for more papers by this author Paul B. Ely, Paul B. Ely Respectively, Hydraulic Engineer and Software Consultant, Arcata, California; and Hydraulic Engineer, The Hydrologic Engineering Center, 609 Second St., Davis, California 95616.Search for more papers by this authorJohn C. Peters, John C. Peters Respectively, Hydraulic Engineer and Software Consultant, Arcata, California; and Hydraulic Engineer, The Hydrologic Engineering Center, 609 Second St., Davis, California 95616.Search for more papers by this author First published: Febraury 1986 https://doi.org/10.1111/j.1752-1688.1986.tb01872.x 1 Discussion No. 85303D of the Water Resources Bulletin 22(1): 137. 2 Paper No. 84017 of the Water Resources Bulletin 20(3):391–395. AboutPDF ToolsRequest permissionExport citationAdd to favoritesTrack citation ShareShare Give accessShare full text accessShare full-text accessPlease review our Terms and Conditions of Use and check box below to share full-text version of article.I have read and accept the Wiley Online Library Terms and Conditions of UseShareable LinkUse the link below to share a full-text version of this article with your friends and colleagues. Learn more.Copy URL Share a linkShare onFacebookTwitterLinked InRedditWechat No abstract is available for this article. Volume22, Issue1Febraury 1986Pages 139-139 RelatedInformation