Abstract
Deterministic watershed models are often used to estimate the probable maximum flood (PMF). An approach for investigating the uncertainty in extreme flood modeling is proposed. Using different calibration objectives, several automatic calibrations of the University of British Columbia watershed model (UBCWM) are conducted and the resulting collection of optimal combinations of parameter values are used to simulate the extreme event. An application to the Coquitlam River Watershed above Coquitlam Dam in southwestern British Columbia shows that the variability among the PMF estimates is relatively small in comparison with the potential uncertainties in estimating extreme events, with coefficient of variation values for peak flow, event volume, and time to peak of 4%, 1%, and 1%, respectively. The PMF-based simulations are relatively insensitive to the different measures of calibration performances.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.